Skip to main content
All solutions

Energy optimization: reduce before producing

CECB audit, BMS, tariff optimization: what you don't consume costs nothing. Often the highest-ROI investment.

Why choose this solution

Official CECB audit

Certified diagnosis recognized by cantons to unlock grants and set the renovation roadmap.

BMS control

Building management system: probes, automation, time scenarios. 15-25% savings without touching the envelope.

Tariff optimization

Electric contract analysis, negotiation, off-peak optimization, peak smoothing.

Use cases

Who is this for?

  • Buildings built before 2000
  • SMEs, retail, offices with high consumption
  • Property managers wanting to upgrade portfolios
  • Before any renewable production project

Our process

  1. /01

    CECB Plus audit

    Visit, bill analysis, thermal modelling, costed proposal booklet.

  2. /02

    Renovation plan

    Prioritization: ventilation > production. 5-15 year phasing with ROI.

  3. /03

    Works coordination

    Contractor selection, site supervision, coordination with other trades.

  4. /04

    Post-works measurement

    Verification of actual gains, adjustments, CECB update.

Indicative pricing

from CHF 1'800

CECB Plus audit from CHF 1,800 (often subsidized). Renovation plans costed case by case.

FAQ — Energy optimization: reduce before producing

Tax advantage · 2026-2028 window

100% deductible from your taxable income

Following the September 28, 2025 federal vote, the tax deduction for energy renovations will be removed from January 1, 2029 at the federal level. Use the current window to save up to 30% of the real cost.

Example — 50,000 CHF project

Potential tax saving:

9 000CHF

30% marginal rate

If postponed after 2029: lost

Indicative estimate. Each situation must be validated by a tax advisor.

Ready to start your project?

Free quote, grant support, in-house team.

Discuss my project